Façade refurbishment
Render, paint, insulation: the scaffold is there anyway. The stair tower makes the climb reasonable for every trade and every delivery of material.
Stair tower Gangelt
Stair tower systems and escape stairs in Kreis Heinsberg
A stair tower carries people, tools and material to every level without a ladder and without a detour. Anton Muckel Gerüstbau builds stair tower systems and escape stairs for sites in Gangelt, erects them with its own fleet and collects them again at the end.
A short form. A phone call works just as well.
The access and the scaffold it hangs on come from one company. That saves you coordinating two firms and keeps the responsibility in one place.
The fixed access for the build. A stair tower stands beside the building or inside the scaffold and links the levels so that every trade gets up and down with tools in hand.
When the existing staircase is being rebuilt, an escape stair made of scaffold components keeps the way out open for as long as work continues.
A stair tower usually belongs to a scaffold. Façade scaffolds, room scaffolds and modular scaffolds come from the same stock, so the access and the working deck fit together.
Where the standard does not fit, it gets planned: heavy duty scaffolds, industrial scaffolds, roofing over, stage building and special structures are all part of what this company does.
Also part of the range
Tell us what is needed. We will come and look at the spot.
As soon as several trades have to reach the same level, the ladder becomes the bottleneck. These four cases bring the stair tower onto the site again and again.
Render, paint, insulation: the scaffold is there anyway. The stair tower makes the climb reasonable for every trade and every delivery of material.
While the solid staircase is missing, the stair tower keeps the routes short and separates the way people walk from the way material travels.
In halls and on plant, a stair leads to places where a ladder is no longer an option for a route walked again and again.
If the existing staircase is closed off, an escape stair keeps the way out open without blocking the programme.

Not sure what your site needs? Just ask.
Five steps that run the same way on every job, so you know in advance who is on your site and when.
You describe the job: what is happening, where it stands and from when the access is needed.
We look at the spot: the ground, the room beside the building, the connection to the scaffold and the approach for the lorry.
You get a quotation for erection, hire period and dismantling before any material arrives on site.
Our own crew builds it. The lorry with loading crane and the telehandler come along where the spot calls for them.
The tower stays up for as long as it is needed. At the end we collect every component again.

It is handed over when the access is finished. Anything that comes up in between is settled on site.
Arrange a date for the survey.
A scaffold needs the machinery that gets material to its place. Anton Muckel Gerüstbau also hires that out on its own.
Hire of lifts with and without passenger transport, matched to the height and to the task.
Telehandlers with a range of attachments, for loads that can no longer be moved by hand.
Lorry with loading crane and container body, for delivery and removal in one run.
Hire periods and terms are agreed individually for each project.
Ask about equipment for your project.
Our own pictures of scaffolds this company put up. Click to enlarge.




These photographs show scaffolds built by this company. None of them shows a stair tower.
The yard is in Linnich. From there we drive out to Gangelt and the neighbouring towns in Kreis Heinsberg, with our own material and our own fleet.
Villages in Gangelt
Neighbouring towns
Is your site just outside this list? Ask anyway and you will get a straight yes or no.
Give us the address and get a call back.
What clients and site managers want to know before the first enquiry.
A tower built from scaffold components with stair flights and landings fitted inside it. It replaces the ladder and makes the route between levels walkable for every trade, tools in hand included.
Yes, and that is the usual route. We erect it, the tower stands for as long as you need it, then we take it down and take everything away.
No. A stair tower can stand on its own or be connected to a façade scaffold. We plan and build both, so the access and the working deck fit together.
For the period in which the existing staircase cannot be used. An escape stair made of scaffold components keeps the way out open until the rebuilding is finished.
The address of the site, the level to be reached, the period you have in mind and a contact on site. Photographs help. Nothing more is needed for the first step.
Yes. From the yard in Linnich we are out across Kreis Heinsberg and the surrounding area. Send the address with your enquiry and you will get a clear answer.
Write briefly what is coming up. We come back with questions or straight with a quotation. If it is urgent, call: a lot goes faster on the phone.
Your details go to Anton Muckel Gerüstbau and are used only to answer this enquiry.